Müşteri İlişkileri
Ahmet POLAT Çevrim İçiContainer Import Tariff - 2025
| STORAGE (CONTAINER PIECE / DAY) | 20' | 40' |
|---|---|---|
| FULL CONTAINER (1-5 DAYS) | $34 | $56 |
| FULL CONTAINER (6-10 DAYS) | $40 | $60 |
| FULL CONTAINER (11+ DAYS) | $53 | $70 |
| FULL REEFER CONTAINER (1-5 DAYS) | $100 | $140 |
| FULL REEFER CONTAINER (6+ DAYS) | $115 | $155 |
| OUT-OF-GAUGE CONTAINER (1-5 DAYS) | $74 | $123 |
| OUT-OF-GAUGE CONTAINER (6+ DAYS) | $88 | $132 |
| GENERAL SERVICES (CONTAINER PIECE) | 20' | 40' |
|---|---|---|
| TERMINAL SERVICE STANDARD CONTAINER (BY TRUCK) | $105 | |
| ENERGY CONTRIBUTION FEE | $10 | |
| TERMINAL SERVICE STANDARD CONTAINER (BY RAIL) | $108 | |
| TERMINAL SERVICE OUT-OF-GAUGE CONTAINER | $210 | |
| IN-PORT TRANSFER (CONTAINER LAYING/COLLECTION) | $120 | |
| TRUCK-LORRY OCCUPANCY | $105 | |
| CFS SERVICES (CONTAINER PIECE) | 20' | 40' |
|---|---|---|
| UNSTUFFING - STANDARD | $255 | $338 |
| UNSTUFFING – WITH EQUIPMENT | $350 | $410 |
| UNSTUFFING – WITH MANPOWER | $375 | $440 |
| UNSTUFFING - CARS FROM CONTAINER (UP TO 3 CARS INCLUDING UNLASHING) | $384 | $468 |
| EXAMINATION AND WEIGHING SERVICES (CONTAINER PIECE) | 20' | 40' |
|---|---|---|
| FULL EXAMINATION | 1850 TL + VAT | 2589 TL + VAT |
| INSPECTION | 1572 TL + VAT | 2221 TL + VAT |
| X-RAY | 1572 TL + VAT | |
| SAMPLING | 1572 TL + VAT | |
| WEIGHING (FROM STACK) | 1300 TL + VAT | |
| WEIGHING (AT THE TIME OF DELIVERY) | 650 TL + VAT | |
| VGM | 609 TL + VAT | |
| NOTICE |
|---|
| CURRENT CUSTOMS TARIFF IS TAKEN AS BASIS FOR THE INSPECTION AND WEIGHING OPERATIONS. |
| OUR PRICE DOES NOT INCLUDE VAT. |
| 20% DIFFERENCE IS APPLIED ON ALL IMO CONTAINER SERVICE ITEMS EXCEPT IMO-1 CLASS |
| FOR THE CONTAINERS TAKEN INTO THE CFS SITE UPON THE REQUEST OF INSPECTION, FULL EXAMINATION OR INTERNAL UNLOADING, AN IN-PORT TRANSFER FEE IS CHARGED IF THE REQUEST IS WAIVED OR IN CASE OF FAILURE TO EXECUTE IT ON THE DATE OF REQUEST. |
| FOR OVERSIZE/OOG CONTAINERS, AN ADDITIONAL 50% SURCHARGE APPLIES TO GENERAL SERVICES, EXCLUDING STORAGE. |
| UNSTUFFING / UNLASHING / LCL PRICING FROM OOG / OT - FLAT RACK CONTAINERS WILL BE EVALUATED SEPARATELY ACCORDING TO THE CARGOES. UNSTUFFING - WITH MANPOWER OPERATION ADDITIONAL LABOR FEE WOULD BE CHARGED ACCORDING TO THE CARGO TYPE, PACKAGE AND WEIGHT. |
| SEPERATE GATE EXIT FEE IS NOT CHARGED FOR UNSTUFFING OPERATIONS. |
| CUSTOMERS WISHING TO RECEIVE CFS SERVICE MUST MAKE A RESERVATION UNTIL 17:00 1 DAY BEFORE THE DATE ON WHICH THEY WISH TO RECEIVE. |
| IN STANDARD UNSTUFFING OPERATIONS, ALL CARGOES LOADED BY USING A FORKLIFT WHICH DOES NOT EXCEED 5 TONS AND FOR WHICH NO ATTACHMENTS ARE USED ARE ACCEPTED AS STANDARD. CARGOES OTHER THAN THIS WILL BE ACCEPTED WITH THE USE OF EQUIPMENT. |
| CFS AND INSPECTION REQUESTS FOR THE CONTAINERS CONNECTED TO POWER IN THE STOCKING AREA, 5 USD ELECTRICITY CONNECTION & DISCONNECTION FEE IS CHARGED. |
| STORAGE OF LEAKING CONTAINERS WILL BE APPLIED ADDITIONAL 250 USD/CONTAINER PER DAY. |
| TRUCK-LORRY OCCUPANCY CHARGE IS APPLIED WHEN IT PASSES 00.00 O'CLOCK AT NIGHT. |
| IMPORT STORAGE DAYS START FROM THE DAY WHEN THE SHIP IS BERTHED. |
| GATE OUTS CAN BE MADE BETWEEN 08:00 AND 00:00 WITHOUT MAKING OVERTIME PAYMENT. |
| IF A DIFFERENT SERVICE IS REQUESTED FOR THE CONTAINER OTHER THAN THE ABOVE SERVICES, IT WILL BE SEPARATELY CHARGED. |
| WAREHOUSE COSTS FOR FULL EXPORT CONTAINERS, WHICH MUST EXIT CUSTOMS BONDED AREA and ENTER BACK INTO THE FREE ZONE DUE TO MISCELLANEOUS REASONS, ARE CHARGED BASED ON OUR IMPORT TARIFF. |
| SAFİPORT RESERVES ITS RIGHT TO CHANGE THE SCHEDULE WITHOUT OBTAINING ANY PRIOR WRITTEN APPROVAL. |
| ACCOUNT INFORMATION |
|---|
| VAKIFBANK ATAŞEHİR ŞUBESİ |
| USD TR40 0001 5001 5804 8015 2571 45 |
| EUR TR88 0001 5001 5804 8015 2589 97 |
| TL TR38 0001 5001 5800 7303 2107 38 |
| YAPI KREDİ KARAKÖY ŞUBESİ |
| USD TR35 0006 7010 0000 0043 3024 02 |
| EUR TR69 0006 7010 0000 0043 3023 72 |
| TL TR 92 0006 7010 0000 0043 3023 46 |